The 2-Minute Rule for stamped concrete
The initial step is to prepare the area – this includes excavation to the right depth to support the base. When the region is ready, the concrete is poured and leveled for the floor.Floor-applied color are dyes, stains, and tinted release agents which might be applied along with the very first two options that support make textures look a lot mor